The status of the works on site, as at the date of our site inspection on 27th November 2017, can be briefly described as follows:
- Site had been partly established with safety fencing and portable toilet on site, no offices, amenities established
- Shake down crossover established.
- Bulk excavation works have begun on site.
- The lot had been surveyed.
- The topsoil had been stockpiled.
Sorry, the comment form is closed at this time.