Obsidian Construction Update – June 2019

Construction Status:

The status of works on site

  • Site fully established
  • Crane erected and operating
  • Basement slab complete
  • Blockwalls and column installation underway to underside of ground slab
  • Ground floor slab completed
  • Verticals and blockwork up to level 1