Canopy Taringa – Mid July Update

The status of the works on site as of the 18th of July 2018:

  • Geocal have fully secured the site with fencing and scaffolding to the entire site setup 
  • Geocal contractors on site for framing , roofing and window installation 
  • Framing completed 100% for both ground and level one 
  • Roof trusses 90% complete 
  • Window installation to 40% of ground level 
 