The status of the works on site, as at the date of inspection on 03 February 2016: Bulk and detailed excavation is complete. Bio-retention tank and pump in. Basement slabs complete. Vehicular ramp and Level 1 [1st pour] underway at the time of inspection. Remainder of Level 1 Form work is in place. Steel reinforcement […]